WP2 CLIMCOR CONTINENTAL budget
1002 k€
Allocation:
- Lake sediment down hole hydraulic hammer
- increasing depth, speed, obtaining longer carrots
- Lake sediment barge: Re-entry (UWITEC)
- improving reliability & assembly
- Sand drill: stationary piston corer
- Triplex stationary piston corer
- obtaining core from inhomogeneous materials
- Coring and drilling equipment
- Logistics equipment
A two-year contract for an assistant engineer: instrument designer.
A one-year contract for an assistant engineer: core data base.